Boiler Beach Reconstruction Plan

Share on Facebook Share on Twitter Share on Linkedin Email this link

The Township of Huron-Kinloss worked along with BT Engineering Inc. to complete a traffic study on Boiler Beach Rd. Boiler Beach Rd is one of the busiest roads in the Township during the summer months. We often hear complaints and concerns from residents and visitors about safety and parking. BT Engineering Inc. is considering all options to address these concerns including: the feasibility of a one-way road between Concession 10 and Huronville St., widening of the roadway, and other opportunities to better accommodate pedestrians and cyclists.

The study evaluates:

  • traffic volumes and circulation options (existing two-way roadway, one-way northbound, one-way southbound),
  • traffic operations and impacts to other roadways; and
  • existing constraints, issues, and opportunities for Boiler Beach Rd.

The study aims to develop a preferred plan to address the needs of the Study Area and accommodate all modes of transportation (motorists, pedestrians, cyclists, and emergency vehicles).

The Township of Huron-Kinloss worked along with BT Engineering Inc. to complete a traffic study on Boiler Beach Rd. Boiler Beach Rd is one of the busiest roads in the Township during the summer months. We often hear complaints and concerns from residents and visitors about safety and parking. BT Engineering Inc. is considering all options to address these concerns including: the feasibility of a one-way road between Concession 10 and Huronville St., widening of the roadway, and other opportunities to better accommodate pedestrians and cyclists.

The study evaluates:

  • traffic volumes and circulation options (existing two-way roadway, one-way northbound, one-way southbound),
  • traffic operations and impacts to other roadways; and
  • existing constraints, issues, and opportunities for Boiler Beach Rd.

The study aims to develop a preferred plan to address the needs of the Study Area and accommodate all modes of transportation (motorists, pedestrians, cyclists, and emergency vehicles).

  • CLOSED: This survey has concluded.

    We want to hear from you! A key part of this project will be public consultation, so we can better understand how residents and visitors are currently affected by the Boiler Beach Rd. concerns and how any potential changes to the road could affect you in the future. 

    The deadline to return the survey is August 14th 2022.